ETSI GS NFV-IFA 027 V2.4.1 |
|
SCOPE | The present document specifies the performance measurements that are exposed on various NFV MANO reference points (e.g. Or-Vnfm, Ve-Vnfm-em, Vi-Vnfm, Or-Vi and Os-Ma-nfvo). ETSI GS NFV-TST 008 specifies the Network Function Virtualisation Infrastructure (NFVI) performance metrics that will be reported to Virtualised Infrastructure Manager (VIM). VIM processes the performance metrics received from NFVI to generate performance measurements to be sent to NFV Orchestrator (NFVO) and VNF Manager (VNFM). VNFM and NFVO conduct further processing to generate performance measurements. |
WORKING GROUP | |
LATEST PUBLICATION DATE | May 2018 |
LINK TO THE LATEST PUBLISHED VERSION | https://www.etsi.org/deliver/etsi_gs/NFV-IFA/001_099/027/02.04.01_60/gs_NFV-IFA027v020401p.pdf |
WIKI WATCH Insert here: activities, gaps, opportunities, and other user driven comments |